Z1DA--556-23-101: Renovate CLC Building 134-2C
SAM.GOV
Due: April 15, 2025 at 03:30 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity Z1DA--556-23-101 involves the renovation of the CLC Building 134-2C at the Captain James A. Lovell Federal Healthcare Center in North Chicago, IL. The project requires a contractor to provide all necessary tools, materials, labor, and supervision to complete the renovations, which include selective demolition, installation of metal studs, gypsum wall board, painting, flooring, electrical work, modifications to the fire protection system, and telecom cabling. The finished area will be approximately 12,590 square feet, and the contractor must ensure compliance with all relevant codes and standards. This opportunity is suitable for construction firms with experience in healthcare facility renovations, particularly those familiar with VA requirements and infection control measures.
Description

556-23-101 Renovate B134-2C CLC July 22, 2024 CONSTRUCTION STATEMENT OF WORK Date: July 22, 2024 Project Number: 556-23-101 Project Name: Renovate B134-2C CLC Location: B134 C-wing 2nd Floor CLC Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work

Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Hudell D Ballen [email protected] None primary
Attachments
  • 36C25225B0005+0003.docx
  • S06_CON-IFB+Amendment+0007+SF30+556-23-101+36C25225B0005_03262025+1.docx
  • S02_Att9+Regulatory+Requirements+01+41+00+24JAN22_556-23-101.pdf
  • S02_Att2+Part+3+of+5+DRAWINGS-Finish+Fire+100+Perent+556-23-101+21June2024.pdf
  • S02_Att1+SPECS+COMBINED+36C25225B0005+556-23-101_06212024.pdf
  • S04_Site+Visit+Sign-In-Sheet+556-23-101+Renovate+CLC+Bldg.+134+-+2C_01212025.pdf
  • 36C25225B0005+Amendment+0008.pdf
  • S02_Att8+Quality+Requirements+01+40+00+19MAY20_556-23-101.pdf
  • S06_Att2+CON-IFB+Amendment+0009+RFI+Pre-Bid+Responses+36C25225B0005+556-23-101_04102025.xlsx
  • 36C25225B0005+0002.docx
  • S06_CON-IFB+Amendment+0009+SF30+556-23-101+36C25225B0005_04102025.pdf
  • 36C25225B0005+0001.docx
  • S02_Att2+Part+2+of+5+DRAWINGS-Electrical+100+Percent+556-23-101+21June2024.pdf
  • S06_CON-IFB+Amendment+0005+SF30+556-23-101+36C25225B0005_03072025.pdf
  • S04_Site+Visit+No.+2+Sign-In-Sheet+556-23-101+Renovate+CLC+Bldg.+134+-+2C_01282025.pdf
  • S06_Att1+CON-IFB+Amendment+0009+SF30+Continuation+Page+36C25225B0005_04102025+1.pdf
  • S06_Att5+CON-IFB+Amendment+0005+Wage+Rates+SAM+IL+current+as+of+02202025.docx
  • S02_Att6+Safety+Requirements+01+35+26+27AUG21_556-23-101.pdf
  • S06_Att4+CON-IFB+Amendment+0009+VAAR+852.219-75+Limitations+on+Subcontracting+556-23-101+36C25225B0005_04102025.pdf
  • S02_Att4+VHA+Directive+Seasonal+Flu+Shot+1192_01_D_2020-08-10_556-23-101.pdf
  • S06_CON-IFB+Amendment+0006+SF30+556-23-101+36C25225B0005_03192025.docx
  • S06_Att1+CON-IFB+Amendment+0005+RFI+Pre-Bid+Responses+36C25225B0005+556-23-101_03062025.xlsx
  • S02_Att2+Part+4+of+5+DRAWINGS-General+100+Percent+556-23-101++21June2024.pdf
  • S02_Att1A+SPECS+Correction+to+Section+232113+and+232213+36C25225B0005+556-23-101_01082025.pdf
  • S02_Att2+Part+1+of+5+DRAWINGS-Architectural+100+Percent+556-23-101+21June2024.pdf
  • S06_Att2+CON-IFB+Amendment+0005+Sheet+MD100+in+Response+to+RFI+Question+13_03062025.pdf
  • S06_Att3+CON-IFB+Amendment+0005+SPECS+Correction+Plus+Section+01+00+00+36C25225B0005+556-23-101_01282025.pdf
  • S06_Att3+CON-IFB+Amendment+0009+Executive+Order+Provision+and+Clause+Changes+36C25225B0005_04102025.pdf
  • S02_Att2A+Addendum+Memo+to+Correct+Select+Drawing+Text_12272024.pdf
  • S02_Att5+Wage+Rates+SAM+IL+current+as+of+01032025.pdf
  • 36C25225B0005_1.docx
  • S06_Att4+CON-IFB+Amendment+0005+Rev1+Addendum+correcting+select+drawing+text+556-23-101_03052025+%281%29.docx
  • S02_Att7+Infection+Control+Requirements+01+35+33+27AUG21_556-23-101.pdf
  • S02_Att10+VAAR+852.219-75+Certification+36C25225B0005_556-23-101.pdf
  • S02_Att3+FHCC+Contracted+Dispensers+36C25225B0005+556-23-101_12192024.pdf
  • S02_Att2+Part+5+of+5+Drawings-Plumbing+Mechanical+100+Percent+556-23-101++21June2024.pdf
  • S06_Att1+CON-IFB+Amendment+0006+RFI+Pre-Bid+Responses+36C25225B0005+556-23-101_03192025.xlsx
  • 1S06_CON-IFB+Amendment+0004+SF30+556-23-101_36C25225B0005.pdf