Z2DA--657A4-21-800, TF - FCA - Remove and Replace End-of-Life HVAC Infrastructure Building 1
SAM.GOV
Due: April 24, 2025 at 07:00 PM UTC
In-Active Presolicitation SDVOSBC Source Url

Summary

The opportunity Z2DA--657A4-21-800 involves the removal and replacement of end-of-life heating, ventilation, and air conditioning (HVAC) infrastructure at Building 1 of the John J. Pershing VA Medical Center located in Poplar Bluff, Missouri. This project is critical for ensuring the continued functionality and comfort of the facility, which serves veterans. Contractors with expertise in HVAC systems, particularly those who are Service-Disabled Veteran-Owned Small Businesses (SDVOSB), are encouraged to bid on this project. The work will require comprehensive construction services, including supervision, labor, materials, and equipment, and will be executed in phases to minimize disruption to the medical center's operations.
Description

PROJECT 657A4-21-800 - TF - FCA - Remove and Replace End-of-Life Heating, Ventilation and Air Conditioning Infrastructure Building 1. The purpose of this amendment is to extend the due date for offers and to provide a revised Wage Determinations.

Entities
VADO
Department of Veterans Affairs
NAICS
238220
Set Aside
SDVOSBC : Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of Performance
John J. Pershing VA Medical Center 1500 N. Westwood Blvd , Poplar Bluff , Missouri 63901
Point of Contact
Full Name Email Phone Type
Lucia Cowsert [email protected] 913-758-9912 primary
Arnold Payne [email protected] 9139461124 secondary
Attachments
  • 36C25525R0009_1.pdf
  • S02+657A4-21-800-ATTACHMENT+6+Price+Estimate+Template+V1.2.xlsx
  • 36C25525R0009+0001.docx
  • S06-36C25525R0009+0006.pdf
  • P09-657A4-21-800-Attachmnet+5-Drawings-Modular+Building+Complex+Volume+1.pdf
  • S06-657A4-21-800+-+Pre-Bid+meeting+Attendance+Roster.pdf
  • 657A4-21-800-Revised+Drawing+MP103.pdf
  • P09-657A4-21-800-Attachmnet+4-Bid+Specs-Volume+3-Divs+21-23_Rev_02052025.pdf
  • 36C25525R0009+0005.pdf
  • 36C25525R0009+0002.docx
  • P09-657A4-21-800-Attachmnet+4-Bid+Specs-Volume+2-Divs+08-13.pdf
  • P09-657A4-21-800-Attachmnet+5-Drawings-Building+1+Volume+2.pdf
  • S06-36C25525R0009+0004.pdf
  • P09-657A4-21-800-Attachmnet+4-Bid+Specs-Volume+1-Divs+00-07.pdf
  • P09-657A4-21-800-Attachmnet+5-Drawings-Building+1+Volume+1.pdf
  • 657A4-21-800-AE+Addendum+Narrative1.pdf
  • 657A4-21-800-Revised+Spec+Section+22+40+00.pdf
  • S02-657A4-21-800-ATTACHMENT+3-Surety+Form.pdf
  • P09-657A4-21-800-Attachmnet+4-Bid+Specs-Volume+4-Divs+26-33.pdf
  • 657A4-21-800-ATTACHMENT+3-Surety+Form_Rv.pdf
  • S02-657A4-21-800-ATTACHMENT+2-Performance+Relevancy+Survey.pdf
  • 657A4-21-800-Revised+Drawings+PL000+PL100+PL101+PL102+PD100+PD101.pdf
  • P09-657A4-21-800-Attachmnet+5-Drawings-Modular+Building+Complex+Volume+2.pdf
  • S06-36C25525R0009+0007.pdf
  • 657A4-21-800-2018+Final+Asbestos+Survey+Combined_Reduced+File+Size.pdf
  • 36C25525R0009+0003.pdf
  • P09-657A4-21-800-Attachmnet+5-Drawings-Building+1+Volume+3.pdf
  • 36C25525R0009.docx
  • S02-657A4-21-800-ATTACHMENT+1+Past+Performance+Questionnaire.pdf