Z2LB--Fisher House Site Preparation, Minor Construction Project
SAM.GOV
Due: May 15, 2025 at 05:00 PM UTC
In-Active Solicitation SDVOSBC Source Url

Summary

The Z2LB--Fisher House Site Preparation project is a minor construction initiative located at the VA Detroit Fisher House in Detroit, Michigan. This project involves the removal and replacement of existing sidewalks, curbing, gutters, and catch basins, as well as landscaping enhancements along Bethune Street. The work is divided into two phases, with the first phase focusing on sidewalk repairs and the second phase on curbing and gutter replacements, irrigation system expansion, and tree planting. Contractors interested in bidding should be Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and must be capable of providing all necessary labor, materials, and project management to meet the specifications outlined in the solicitation package. The project has a budget range of $100,000 to $250,000 and must be completed within 45 calendar days after the notice to proceed.
Description

553-305 Fisher House Minor Construction Site Preparation, Detroit MI
In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.  The contractor will be required to provide all labor, pro

Entities
VADO
Department of Veterans Affairs
NAICS
237310
Set Aside
SDVOSBC : Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of Performance
Detroit , Michigan 48202
Point of Contact
Full Name Email Phone Type
Emil Reyes [email protected] 216-447-8300 primary
Attachments
  • Attachment+09+-+Wayne_County_WD_MI20250101_4APR2025.pdf
  • Attachment+08+-+Fisher+House+Drawings+6+thru+11.pdf
  • Attachment+03+-+Subcontractor+Information+and+Consent+Form.docx
  • Attachment+10+-+Fisher+House+Site+Map.pdf
  • Attachment+05+-+SOW+Fisher+House+Sitework.pdf
  • 36C77625R0041.pdf
  • Attachment+01+-+Limitations+on+Subcontracting.docx
  • Attachment+02+-+Project+Information+Sheet+for+Contractors.docx
  • Attachment+07+-+Fisher+House+Drawings+1+thru+5.pdf
  • Attachment+06+-+Specifications_553-305_Fisher_House_Site_Prep.pdf
  • Attachment+04+-+Past+Performance+Questionnaire.docx