Z--CRLA 245275 - Intelligent Transportation System
SAM.GOV
Due: April 23, 2025 at 10:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity Z--CRLA 245275 involves the implementation of an Intelligent Transportation System at Crater Lake National Park in Oregon. The project includes the installation of solar-powered, radar-activated roadway signs, portable changeable message signs, and web cameras, as well as the construction of a turnout for signage and striping along scenic byways. This solicitation is a total small business set-aside, making it ideal for small contractors specializing in highway, street, and bridge construction. Interested bidders should have experience in similar installations and be capable of managing the logistics of working in a national park environment.
Description
CRLA 245275 - Intelligent Transportation System, Crater Lake National Park, OR.

The work consists of:
1. Installing multiple solar-powered, radar-activated roadway signs including two flashing icy road warning signs at key locations along Highway 62 and two queue warning signs near th
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Smith, Brenda [email protected] 720-315-2035 primary
Attachments
  • B08_Attach_3_Contract_Price_Schedule_CRLA_245275.xlsx
  • Sol_140P2025R0017_Amd_0003.pdf
  • B08_Attach_1_CRLA_245275_Specifications_Final_03_29_2024.pdf
  • B08_Attach_2_CRLA_245275_Drawings.pdf
  • Att_11_CRLA_245275_Solicitation_%28rev%29_4-7-25_0003.pdf
  • B08_Attach_7_Past_Performance_Questionnaire.docx
  • B08_Attach_5_Limitations_on_Subcontracting_Report.xlsx
  • Att_9_Solicitation_Amendmt_Two_Sec_B-M_%28rev%29_4-1-25_0002.pdf
  • B08_Attach_4_WD_OR20250001_01_10_2025.pdf
  • Sol_140P2025R0017.pdf
  • Att_10_RFIs_4-1-25_0002.pdf
  • B08_Attach_8_Banking_Information_Questionnaire.docx
  • Sol_140P2025R0017_Amd_0001.pdf
  • Sol_140P2025R0017_Amd_0002.pdf
  • B08_Attach_6_Project_Experience_Questionnaire.docx
  • Att_12_RFIs_4-14-25_0003.pdf