Z--Dunn Main House Rehabilitation, NPS-PORE
SAM.GOV
Due: August 1, 2025 at 10:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity for the Dunn Main House Rehabilitation at Point Reyes National Seashore involves a comprehensive renovation of an existing farmhouse to convert it into a housing compound for park employees. The project will transform the current 3-bedroom, 3-bathroom house into an 11-bed, 5-unit facility, including the renovation of an art studio and a garage into additional dwelling units. Contractors with experience in residential rehabilitation, particularly those familiar with historical renovations and small business qualifications, are encouraged to bid on this project. The work will require adherence to local, state, and federal regulations, and the project budget is estimated between $1,000,000 and $5,000,000.
Description
DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA.

This Amendment 0005 provides corrected versions of the site visit sign-in sheets.
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Marshall , California 94940
Point of Contact
Full Name Email Phone Type
Gardner, Alanna [email protected] 415-858-9668 primary
Attachments
  • Pre-Solicitation_Announcement_140P8425R0002_1.pdf
  • B08_Attachment_1_Specifications.pdf
  • B08_Attachment_3_Site_Visit_Map___Directions.pdf
  • Sol_140P8425R0002.pdf
  • B08_Attachment_2_Wage_Determination.pdf
  • B08_Attachment_4_Proposal_Submission_Package.pdf
  • B08_Attachment_5_Site_Visit_Sign-In_Sheet_0001.pdf
  • B08_Attachment_2_Wage_Determination_27Jun2025_0001.pdf
  • B08_Attachment_7_Dunn_Ceiling_Finishes_0001.pdf
  • Sol_140P8425R0002_Amd_0001.pdf
  • B08_Attachment_6_Q-A_Amendment_1__Summary_0001.pdf
  • Sol_140P8425R0002_Amd_0002.pdf
  • Sol_140P8425R0002_Amd_0003.pdf
  • Sol_140P8425R0002_Amd_0004.pdf
  • B08_Attachment_8_2nd_Site_Visit_Sign-In_Sheet_0003.pdf
  • B08_Attachment_2_Wage_Determination_18Jul2025_0003.pdf
  • B08_Attachment_9_Q-A_Amendment_3__Summary_0003.pdf
  • Sol_140P8425R0002_Amd_0005.pdf
  • B08_Attachment_8_2nd_Site_Visit_Sign-In_Sheet_Corrected_0005.pdf
  • B08_Attachment_5_Site_Visit_Sign-In_Sheet_Corrected_0005.pdf