Z--FOG SEAL 18 MILES OF PINTO BASIN RD
SAM.GOV
Due: June 17, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves a construction project for the fog sealing and restriping of 18 miles of Pinto Basin Road within Joshua Tree National Park. The contractor will be responsible for planning, scheduling, and executing the application of a fog seal, which includes surface preparation, the application of asphalt emulsion, and the repainting of road markings to match original specifications. This project is a total small business set-aside, making it ideal for small construction firms with experience in road maintenance and asphalt work. Contractors should be familiar with CalTrans specifications and have the capability to manage traffic control during the project.
Description
FOG SEAL 18 MILES OF PINTO BASIN RD
Amendment 0002 - Q&A, Revised Wage Determination
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Bachelier, Caroline [email protected] 0000000000 primary
Attachments
  • B08_-_Atch_1_-_SOW__-_JOTR_Fog_Seal_and_Restrip_Pinto_Basin_Road_1_29.pdf
  • Sol_140P8125B0007.pdf
  • B08_-_Atch_4_-_Construction_Contraction_Administration.pdf
  • B08_-_Atch_3_-_Wage_Determination_CA_20250026_3_28_25.pdf
  • B08_-_Atch_2_-_Fog_Seal_Images_with_Locations_18_Miles_Pinto_Basin_Rd.pdf
  • Sol_140P8125B0007_Amd_0001.pdf
  • Sol_140P8125B0007_Amd_0002.pdf
  • WD_CA20250026_6_6_25_0002.pdf