Z--GAOA Forest Road 278 Bridge Structure Replacemet GMNF
SAM.GOV
Due: June 9, 2025 at 09:00 PM UTC
In-Active Special Notice Source Url

Summary

The opportunity titled 'Z--GAOA Forest Road 278 Bridge Structure Replacement GMNF' involves the replacement of a bridge structure located in the Green Mountain National Forest. This project is a special notice issued by the USDA Forest Service, and it is aimed at contractors with expertise in bridge construction and structural engineering. The work will require adherence to specific design and construction standards, including compliance with federal specifications. Contractors interested in this opportunity should have experience in similar projects, particularly those involving heavy civil construction and bridge work, and must be prepared to meet the environmental and safety regulations associated with federal contracts.
Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237310
Set Aside
None
Place of Performance
Point of Contact

Full Name Email Phone Type
Attachments
  • 12445525R0003_Attachment_4_Plans_GMNF_FR278-0_24_Bridge_Superstructure_Replacement_1.pdf
  • 12445525R0003_Attachment_3_FSSS__FR278_Bridge_Superstructure_Replacement_GMNF_1.docx
  • 12445525R0003_Attachment_2_SOW_GMNF_FR278-0_24_Bridge_Superstructure_Replacement_1.docx
  • 12445525R0003_Attachment_1_SOI_FR278_Bridge_Superstructure_Replacement_GMNF_1.xlsx
  • 12445525R0003_Attachment_5_Wage_Determination_VT20240062_Heavy_Bennington_010325_1.pdf
  • 12445525R0003+Request+for+Proposal+GAOA+FR278+Bridge+Structure+Replacement+GMNF.pdf