Z--GAOA MELSTONE DAM RECONSTRUCTION
SAM.GOV
Due: January 7, 2026 at 09:00 PM UTC
Active
Solicitation SBA Source Url

Summary

The GAOA Melstone Dam Reconstruction project, managed by the Bureau of Land Management (BLM), involves comprehensive construction work to repair the Melstone Dam located in Musselshell County, Montana. The project requires contractors to provide all necessary labor, materials, equipment, and supervision for various tasks, including dewatering the construction area, excavating and reconstructing the dam embankment, and installing new outlet works and drainage systems. This opportunity is particularly suited for small businesses specializing in heavy and civil engineering construction, as it is set aside for total small business participation. Contractors should be prepared to manage a project with an estimated value between $1 million and $5 million, and they must comply with specific onsite work restrictions during certain months of the year.
Description
GAOA MELSTONE DAM RECONSTRUCTION
Entities
IDOT
Department of the Interior
BOLM
Bureau of Land Management
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
McKeon, Lisa [email protected] 850-890-6395 primary
Attachments
  • 25R0012_PreSolNotice_2.pdf
  • Att2_Specifications_Jan2025.pdf
  • Att3_WD_MT20250077_18Jul25.pdf
  • Att7_140L0625R0012_Past_Perf_Questionnaire_23Sep.docx
  • Att2B_Specifications_Fence_15Aug25.pdf
  • Sol_140L0625R0012.pdf
  • Att6_Experience_ProjectDataSheet_Const.docx
  • Att8_RFI_Form_23Sep.xlsx
  • Att4_Price_Breakout_23Sep.pdf
  • Att1_Drawings_20241122.pdf
  • Att1B_Drawings_Fence_9Sep25.pdf
  • Att5_Lim_on_SubK_Breakout.xlsx
  • Sol_140L0625R0012_Amd_0001.pdf
  • 140L0625R0012_ContPages_AM02_0002.pdf
  • Sol_140L0625R0012_Amd_0002.pdf
  • Att7_140L0625R0012_Past_Perf_Questionnaire_AM02_0002.docx
  • Sol_140L0625R0012_Amd_0003.pdf