Z--INSTALL BOAT DOCK COVERS AT WILLOW BEACH MARINA 3
SAM.GOV
Due: June 15, 2025 at 08:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity involves the installation of boat dock covers at Willow Beach Marina, located within the Lake Mead National Recreation Area. The project requires contractors to design, fabricate, and install a dock slipcover system for 26 slips on Dock 3, ensuring that all materials are suitable for a freshwater marine environment. Contractors should be experienced in marine construction and capable of providing all necessary labor, materials, and equipment for the project. The work is expected to enhance the marina's facilities, providing protection for boats from harsh environmental conditions. Interested bidders should be prepared to comply with specific engineering and material standards outlined in the solicitation documents.
Description
Amendment 00003: Posted attachments are 1) B09_Q&A 5-29-25, 2) "B09_ATTACHMENT F DOCK #3 AS BUILTS", 3) "B09_ATTACHMENT A SOW Amended 5-29-25".

The closing date of this solicitation has been extended to 6-15-25 1300 Pacific Time. Bid opening will be held 24 hours after bid
closing. Pu
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237990
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Metler, Bradley [email protected] None primary
Attachments
  • B08_ATTACHMENT_D_Site_Visit.pdf
  • B09_ATTACHMENT_F_DOCK__3_AS_BUILTS_0003.pdf
  • Sol_140P8125B0005_Amd_0002.pdf
  • B09_ATTACHMENT_A_SOW_Amended_5-29-25_0003.pdf
  • B09_Q_A_5-29-25_0003.pdf
  • B08_ATTACHMENT_E_Limitation_on_Subcontracting.xlsx
  • B08_ATTACHMENT_A_SOW.pdf
  • Sol_140P8125B0005.pdf
  • Sol_140P8125B0005_Amd_0003.pdf
  • Sol_140P8125B0005_Amd_0001.pdf
  • B08_ATTACHMENT_C_Construction_Contract_Administration.pdf
  • B08_ATTACHMENT_B_DB_WD.pdf