Z--Olympic NP - REHAB HURRICANE RIDGE WATER
SAM.GOV
Due: June 17, 2025 at 12:00 AM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Z--Olympic NP - REHAB HURRICANE RIDGE WATER' involves the rehabilitation of the water system at Hurricane Ridge within Olympic National Park, Washington. The project includes replacing and upgrading the existing water storage and distribution system, which serves the public water system ID NP390. Key tasks include the installation of new high-density polyethylene piping, electrical conduits, and various appurtenances, as well as the rehabilitation of a 100,000-gallon water storage reservoir. Contractors with experience in water and sewer line construction, particularly those who are small businesses, are encouraged to bid on this project, as it is a total small business set-aside. The work is expected to be complex, requiring adherence to environmental regulations and coordination with park operations.
Description
Olympic National Park - REHAB HURRICANE RIDGE WATER: Purpose of Amendment 0004 is to provide FINAL responses to contractor questions
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237110
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Larsen, Geraldine [email protected] None primary
Attachments
  • A06_Attachment_C_-_Fire_Hydrant_Assembly.pdf
  • A07_Plans_OLYM_PMIS_306966-307067_22x34_Signed_100__Final_attachment_2.pdf
  • B08_Project_Experience_Questionnaire_Attachement__7.docx
  • B08_2024_Construction_RFP_Clauses_5_13_2025_0001.pdf
  • B08_Contract_Price_Schedule_OLYM_Final_attachment_3.pdf
  • A06_Specifications_OLYM_PMIS_306966-307067_Signed_100__Final_attachment_1.pdf
  • B08_Offeror_s_representations_and_certificates_to_be_provided_with_proposal_Attachment__9.pdf
  • B08_PAST_PERFORMANCE_QUESTIONNAIRE_Attachememt___6.docx
  • B08_Limitations_on_Subcontracting_Worksheet_Attachment_8.xlsx
  • B08_Hurricane_Ridge_Water_Rehab_Photos_attachment.pdf
  • Sol_140P8325R0005.pdf
  • Sol_140P8325R0005_Amd_0001.pdf
  • A03_-_Construction_Contract_Administration_attachment___5.docx
  • B03_WA20250044_01_03_2025_SAM_Attachment_4.pdf
  • Sol_140P8325R0005_Amd_0002.pdf
  • B11_Site_Visit_Q_A_0002.docx
  • A06_Specifications_OLYM_PMIS_306966-307067_Signed_100__Final_0002.pdf
  • B11_Site_Visit_Sign-in_0002.docx
  • B09_questions_1_7-_6_5_25_0003.docx
  • Sol_140P8325R0005_Amd_0003.pdf
  • Sol_140P8325R0005_Amd_0004.pdf
  • Final_Questions_NPS_Responses_0004.xlsx