SAM.GOVDue: July 8, 2025 at 06:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT is a significant construction opportunity issued by the U.S. Army Corps of Engineers aimed at repairing storm-damaged flood control channels in Alameda County, California. The project involves extensive earthwork to restore ten specific sites along Arroyo Mocho and Alamo Canal, which suffered erosion and bank failures due to severe weather events between December 2022 and March 2023. Contractors with expertise in civil engineering, particularly those experienced in flood control and erosion repair, are encouraged to bid on this project. The work will include excavation, placement of rock slope protection, and installation of erosion control measures, making it suitable for small businesses specializing in construction and environmental restoration.