Z--Repair/Replace HVAC at HQ/NOC, NPS-REDW
SAM.GOV
Due: July 29, 2025 at 10:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The National Park Service (NPS) is seeking contractors to rehabilitate the HVAC system components at the Park Headquarters and North Operations Center located in Crescent City, California. This project involves replacing existing mechanical equipment with new systems, including a Dedicated Outdoor Air System (DOAS) for the headquarters and a variable refrigerant flow (VRF) system for the operations center. The work will also include necessary electrical and structural upgrades, as well as optional tasks such as roof structure replacement and installation of new air units. This opportunity is ideal for small businesses with experience in HVAC installation and rehabilitation, as it is a Total Small Business Set-Aside. Contractors will need to provide all necessary supervision, labor, and materials to complete the project in compliance with applicable laws.
Description
REHABILITATE HVAC SYSTEM COMPONENTS AT PARK HEADQUARTERS (HQ) AND NORTH OPERATIONS CENTER (NOC), REDWOOD NATIONAL AND STATE PARKS, DEL NORTE COUNTY, CALIFORNIA.

This Amendment provides the Sign-In Sheet and Site Visit Notes from the recent July 1, 2025 site visit which answers all question
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Crescent City , California 95531
Point of Contact
Full Name Email Phone Type
Gardner, Alanna [email protected] 415-858-9668 primary
Attachments
  • Pre-Solicitation_Announcement_140P8425R0001_1.pdf
  • Sol_140P8425R0001.pdf
  • B08_Attachment_1_Specs_REDW_204034_HQ_HVAC.pdf
  • B08_Attachment_5_Wage_Determination.pdf
  • B08_Attachment_6_Proposal_Submission_Package.pdf
  • B08_Attachment_4_Drawings_REDW_266848_NOC_HVAC.pdf
  • B08_Attachment_2_Drawings_REDW_204034_HQ_HVAC.pdf
  • B08_Attachment_3_Specs_REDW_266848_NOC_HVAC.pdf
  • Sol_140P8425R0001_Amd_0001.pdf
  • Sol_140P8425R0001_Amd_0002.pdf
  • B08_Attachment_7_Site_Visit_Sign-In_Sheet_0002.pdf
  • B08_Attachment_8_Q-A_Amendment_2_Summary_0002.pdf