Z--REPLACE TRAIL BOARDWALK
SAM.GOV
Due: July 10, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Z--Replace Centennial Trail Boardwalk Phase I' involves the removal and off-site disposal of existing boardwalk structures, posts, and related appurtenances at the Bon Secour National Wildlife Refuge. This project requires some vegetation removal as part of the preparatory work. It is a presolicitation notice issued by the Department of the Interior, specifically set aside for total small businesses, indicating that only small business contractors are eligible to bid. The work will be awarded based on the lowest price technically acceptable (LPTA) method, and interested contractors should be prepared to demonstrate their technical approach, past performance, and overall capability in their proposals. This opportunity is ideal for small construction firms with experience in similar environmental and infrastructure projects.
Description
Amendment Replace Centennial Trail Boardwalks (Phase I)
Entities
IDOT
Department of the Interior
UFAWS
U.S. Fish and Wildlife Service
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
12295 State Highway 180 , Gulf Shores , Alabama 36542
Point of Contact
Full Name Email Phone Type
Mallory, Joann [email protected] 4046797274 primary
Attachments
  • B01-Synopsis_Pre-Solicitation_Notice_1.pdf
  • Attachment_4-B08-Bid_Schedule_Redacted.pdf
  • Attachment_3-A06-Drawings.pdf
  • Attachment_5-B03-DOL_Wage_Determination.pdf
  • Sol_140FHR25R0007.pdf
  • Attachment_2-A04-Statement_of_Work%28SOW%29_Demo.pdf
  • Attachment_1-B08-Solicitation%28RFP%29_Replace_Trail_Boardwalk.pdf
  • Sol_140FHR25R0007_Amd_0001.pdf
  • Attachment_REVISED_SECTION_M_mab_06122025_0001.pdf
  • Sol_140FHR25R0007_Amd_0002.pdf
  • Attachment_7-RFI_for_Replace_Centennial_Trail_Boardwalk__Phase_I_6-24-2025_0002.pdf
  • Attachment_8-Drawings_-_revised_6-24-2025_0002.pdf